07703 299219 
tony@wavelengthacoustics.co.uk 
07703 299219 / info@wavelengthacoustics.co.uk 

Previous Installations 

Please see below for some examples of our work. All drapes were supplied by J&C Joel Ltd. 
 
 
 
 
 
 
 
 
 
 
Heavy velvet velour lined with sateen

FOH and masking drapes 

A village hall in Hertfordshire had undergone an extensive renovation and just needed new curtains to complete the programme. They wanted the stage to look like a professional theatre so we supplied a pair of Heavy Velvet Velour curtains, lined with sateen to give a sumptious finish to the venue. Matching masking drapes were supplied to mask off the wings. 
Blackout curtains, velvet velour with Eclipse lining

Blackout drapes 

The same hall needed blackout curtains on all of the windows and doors. We supplied a complete set made from Velvet Velour with uV resistant Eclipse lining. Professional standard curtain tracks were fitted to allow smooth operation and a long working life. 

Acoustic curtains 

An office in London had a problem with noise from the main area being reflected into the mezzanine meeting area. We supplied 3 pairs of Silver Velvet Velour curtains, lined with kilo wool serge. The curtains were hung on 3x motorised tracks of different lengths due to variations in the window sizes. The 3 tracks were programmed on a single radio remote channel. A radio switch was mounted on the wall at each end of the room. 
Heavy velvet velour lined with sateen

Track Maintenance 

"Thank you again for your prompt and professional service" Mark Allbut- Manager. 
 
We recently had an urgent call from Fenland Crematorium. They have a Hall Stage T60 motorised track and the steel cable had worn out - it was literally hanging on by the last thread. 
 
We were on site within 48 hours and just in time- the last strand broke as it wound off of the drum. The system was then re-cabled and the limits set in time for the first service of the day. 
Heavy velvet velour lined with sateen

Barn Studio Conversion 

We were contacted by a customer with a small barn-style building. They needed to use one end as a TV studio for recording product demonstrations and wanted drape that would give a black background and would also improve the acoustics. The drape needed to be drawn back when not in use. 
 
We needed to make the drape as high as possible because the distance from the floor to the eaves was barely 2m. To do this, we chose a U-shaped Triple E 2Way track on Hall Stage wall brackets and set golf bag hooks 30mm below the top of the drape. This meant that there wasn’t a gap between the drape and the track, giving the maximum usable height of the black backdrop. 
 
The drape was supplied by J&C Joel Ltd. and was made from Premier wool serge, sewn flat to give an even background as all filming is done close to the drape. The acoustics in the room are improved noticeably when the drape is deployed. 
Heavy velvet velour lined with sateen

Acoustic Curtains for City Centre House 

A recent inquiry was from a family who had just moved into a house in Cambridge city centre and were having problems with noise from the crowds and nearby bus garage. The already had double glazing but were still having problems with the lower frequencies. 
 
The brief was to reduce tyhe noise as much as possible and to give an almost total blackout with drapes that still looked good in the domestic setting. 
 
The answer was to use multiple layers of Kilo wool serge with a Bolton Twill face fabric. Professional quality tracks were fixed directly to the ceiling and the curtain hooks were set below the tops of the drapes to ensure that there were no gaps at the top. 
 
The difference was immediately noticeable and even the sound of bus engines almost completely disappeared. 
 
 

FOH and masking drapes 

Heavy velvet velour lined with sateen. 

Blackout drapes 

Velvet velour lined with Eclipse 

Acoustic curtains 

Silver velvet velour lined with kilo wool serge. The curtains were hung on 3x motorised tracks of different lengths due to variations in the window sizes. The 3 tracks were programmed on a single radio remote channel. A radio switch was mounted on the wall at each end of the room. 

 

Track Maintenance 

"Thank you again for your prompt and professional service" Mark Allbut- Manager. 
 
We recently had an urgent call from Fenland Crematorium. They have a Hall Stage T60 motorised track and the steel cable had worn out - it was literally hanging on by the last thread. 
 
We were on site within 48 hours and just in time- the last strand broke as it wound off of the drum. The system was then re-cabled and the limits set in time for the first service of the day. 
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings